...

Case Studies

PORR STRABAG Deutsche Bahn Rail Power Systems Pfaffinger
Rail Power Systems Case Study: From pilot to company-wide roll-out

Rail Power Systems

From pilot to company-wide rollout

RPS uses SitePlan for digital stake-out, surveying and georeferenced documentation of overhead catenary systems across the entire DB network. The result: over 1,000 surveying hours saved per year.

Read case study ➔

PORR

94 % time savings on utility marking

With SitePlan, PORR digitizes central site processes – including utility marking in the field. Orientation takes place in the digital GPS plan, which saves up to 94 % time and significantly reduces errors.

Read case study ➔

Pfaffinger: measurement and stake-out without a surveyor

Pfaffinger

Measurement and stake-out without a surveyor – by the foreman

With SitePlan, Pfaffinger has reduced its dependence on surveyors. Foremen stake out on their own and create GPS measurements on site. Result: no more site standstills, faster final accounts.

Read case study ➔

Deutsche Bahn

Logging track walks digitally: 65% time savings

During track walks, Deutsche Bahn captures photos, notes and survey points right on site – GPS-accurate and clearly geolocated in the plan. No rework, no assignment chaos. The report is created in a few clicks.

Read case study ➔

Three corporations, one standard: GPS documentation in civil engineering

STRABAG · PORR · DB

Three corporations, one standard: GPS documentation in civil engineering

When STRABAG, PORR and Deutsche Bahn rely on the same tool, there is a reason: SitePlan solves the documentation problem all civil engineering contractors share.

Read case study ➔

Congo solar park

Solar park in Congo – progress through clarity

With SitePlan, teams keep the overview even across large distances – data, photos and plans are available centrally, even under difficult conditions and with limited internet connection.

Read case study ➔

Similar construction site?

Get to know us. Find out in a personal demo how SitePlan changes everyday life on the construction site.

#!trpst#trp-gettext data-trpgettextoriginal=0#!trpen#Seraphinite Accelerator#!trpst#/trp-gettext#!trpen##!trpst#trp-gettext data-trpgettextoriginal=0#!trpen#Optimized by #!trpst#trp-gettext data-trpgettextoriginal=0#!trpen#Seraphinite Accelerator#!trpst#/trp-gettext#!trpen##!trpst#/trp-gettext#!trpen#
#!trpst#trp-gettext data-trpgettextoriginal=0#!trpen#Turns on site high speed to be attractive for people and search engines.#!trpst#/trp-gettext#!trpen#