Case Studies
Rail Power Systems
From pilot to company-wide roll-out
RPS uses SitePlan for the digital staking out, surveying and georeferenced documentation of overhead line systems throughout the entire DB network. The result: over 1,000 surveying hours saved per year.
PORR
94 % Time saving for line markings
With SitePlan, PORR is digitizing central construction site processes - including line marking in the field. Orientation takes place in the digital GPS plan, which saves up to 94 % of time and significantly reduces errors.
Pfaffinger
Measurement and setting out without a surveyor - by the foreman
Pfaffinger has reduced the dependency on surveyors with SitePlan. Foremen stake out independently and create GPS measurements on site. The result: no more construction site downtime, faster invoicing.
German Railways
Digitally log route inspections: 65% Time saving
During route inspections, Deutsche Bahn records photos, notes and measuring points directly on site - GPS-accurate and clearly located in the plan. No reworking, no assignment chaos. The report is created with just a few clicks.
STRABAG - PORR - DB
Three companies, one standard: GPS documentation in civil engineering
There is a reason why STRABAG, PORR and Deutsche Bahn rely on the same tool: SitePlan solves the documentation problem that all civil engineers share.
Congo solar park
Solar park in Congo - progress through clarity
With SitePlan, teams can maintain an overview even over long distances - data, photos and plans are centrally available, even under difficult conditions and with a limited Internet connection.
