Knowledge Hub
12 features that save site managers time and stress every day
Why do so many site managers choose SitePlan? A look at the 12 most important features shows how simple modern construction documentation can be today.
Read more →
Digital surveying in civil engineering: Field report from 5,000 construction sites
Just imagine: Your construction site team can carry out measurements, surveys and documentation directly on site - without external surveyors.
Read more →
Frequently Asked Questions
How accurate is the GPS? How does the trial work? What does SitePlan cost? Find all the answers in our FAQs – short, clear, and up to date.
Read more →
GNSS rover too complicated? SitePlan is the smart alternative
It sounds perfect on paper: a new GNSS rover system, a new employee, the goal of digital surveying. But the reality is different.
Read more →
RPS: From pilot to company-wide roll-out
With a clear rollout concept, SitePlan evolved from a pilot project into a company-wide solution.
Read more →
DXF in real time: From field measurement to CAD in minutes instead of hours
A measurement in the wrong format is often enough - and the detour via conversion begins. With SitePlan, this is no longer necessary.
Read more →
Clients are driving digital transformation in civil engineering
Clients such as local authorities or network operators receive verified evidence, and civil engineers save time and effort.
Read more →
Deutsche Bahn: Time saving 65 % for inspection reports
The DB Bahnbau Group estimates that SitePlan helps to speed up the creation of track access protocols by 65 %.
Read more →
Rethinking civil engineering: Measuring wheels and tape measures are a thing of the past
Imagine your construction site team being able to carry out measurements, setting out and documentation independently - without external surveyors.
Read more →
Time is money: How civil engineers save over €5,000 per month
Stopwatch on – we compare SitePlan with traditional, manual site workflows. Even a 3-person team can save over €50,000 per year using SitePlan.
Read more →
3 Staking out functions of SitePlan
SitePlan allows site managers, technicians and foremen to define many points themselves. There are three functions for this: Staking out, line staking out and plan orientation.
Read more →
PORR saves 94% time on utility markings
With SitePlan’s digital utility marking, PORR was able to significantly shorten construction time on a district heating project.
Read more →
9 functions for a waterproof photo documentary
With these 9 app functions for GPS photo documentation, every shot is automatically located, labeled and saved as evidence.
Read more →
Digital docu in civil engineering: 4 objections, 4 answers
Many in civil engineering have tried out digitalization - and quickly abandoned it. Too costly, too far removed from everyday life. But there is another way.
Read more →
Pfaffinger: From pilot project to standard solution
With SitePlan, Pfaffinger digitizes construction processes from staking out to documentation - now established company-wide and indispensable.
Read more →
As a client: Ensure a complete construction site docu from construction companies
With SitePlan, you as the client get access to your contractor's project - and see live exactly what is being documented on site.
Read more →
STRABAG, PORR and Deutsche Bahn rely on SitePlan
How STRABAG, PORR and Deutsche Bahn use SitePlan to deliver projects faster, more cost-effectively, and more safely.
Read more →
Fotobericht in Sekunden statt Fotochaos
Moderne Tiefbau-Baustelle – aber Fotodoku wie vor 20 Jahren? So wird Ihre Fotodokumentation endlich nutzbar.
Read more →
Frequently asked questions about the GPS photo documentary
How accurate are the GPS coordinates? How many photos can I save per project? Can I also use it offline?
Read more →
The civil engineering vicious cycle – and how to break it
Stress - improvisation - rework - invoice reduction? Welcome to the daily routine of many civil engineering construction sites. But this vicious circle is not a law of nature.
Read more →
Solar park project in Congo - progress through clarity
266 MW PV in Congo: How SitePlan makes the project precisely controllable from the first clearing to documentation.
Read more →
Construction site measurement report in just 3 clicks
Measuring via app + GNSS antenna. Points, photos, notes, time & location are automatically recorded and transmitted to the office in real time.
Read more →
BIM in civil engineering: Buzzword or enormous potential?
Many people associate it with complex software, large IT projects and a lot of theory. But it doesn't have to be that complicated.
Read more →