{"id":1908,"date":"2025-05-07T08:32:08","date_gmt":"2025-05-07T06:32:08","guid":{"rendered":"https:\/\/www.siteplan.at\/?p=1908"},"modified":"2026-03-25T11:47:29","modified_gmt":"2026-03-25T10:47:29","slug":"civil-engineering-rethought","status":"publish","type":"post","link":"https:\/\/www.siteplan.at\/en\/tiefbau-neu-gedacht\/","title":{"rendered":"Rethinking civil engineering: Measuring wheels and tape measures are a thing of the past"},"content":{"rendered":"<div class=\"wpb-content-wrapper\" id=\"wpb-content-root\"><div class=\"vc_row wpb_row vc_row-fluid\"><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div  class=\"wpb_single_image wpb_content_element vc_align_left wpb_content_element\">\n\t\t\n\t\t<figure class=\"wpb_wrapper vc_figure\">\n\t\t\t<div class=\"vc_single_image-wrapper\"><img loading=\"lazy\" decoding=\"async\" width=\"1500\" height=\"1125\" src=\"https:\/\/www.siteplan.at\/wp-content\/uploads\/rethinking-civilengineering.png\" class=\"vc_single_image-img attachment-full\" alt=\"Rethinking civil engineering: Measuring wheels and tape measures are a thing of the past\" title=\"rethinking-civilengineering\" srcset=\"https:\/\/www.siteplan.at\/wp-content\/uploads\/rethinking-civilengineering.png 1500w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rethinking-civilengineering-300x225.png 300w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rethinking-civilengineering-1024x768.png 1024w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rethinking-civilengineering-768x576.png 768w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rethinking-civilengineering-16x12.png 16w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rethinking-civilengineering-360x270.png 360w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rethinking-civilengineering-100x75.png 100w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rethinking-civilengineering-960x720.png 960w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rethinking-civilengineering-480x360.png 480w\" sizes=\"auto, (max-width:767px) 480px, (max-width:1500px) 100vw, 1500px\" \/><\/div>\n\t\t<\/figure>\n\t<\/div>\n\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<p>Imagine your site team can carry out measurements, stake-outs and documentation on its own, fast and precisely \u2013 without external surveyors or expensive special equipment. That is exactly what SitePlan makes possible.<br \/>\n<!--more--><\/p>\n<p>Proven in over 5,000 civil engineering projects, the SitePlan app transforms analog, paper-based processes into a digital workflow that even non-surveyors can use immediately.<\/p>\n<p>Welcome to the future of construction site documentation:<\/p>\n<h2>Analog site processes in the digital age \u2013 an expensive obstacle<\/h2>\n<p>Despite technological progress, many civil engineering projects still run on paper-based processes that are not only inefficient but also error-prone. Site managers, foremen and billing technicians face practical challenges every day that digital solutions could have simplified long ago.<\/p>\n<h3>1. Paper plans as a constant brake on site<\/h3>\n<p>On site, large-format paper plans are extremely impractical. They constantly have to be unfolded, read and interpreted \u2013 a constant search for orientation.<\/p>\n<h3>2. Laborious manual surveying<\/h3>\n<p>Manholes, service connections or utility lines often have to be staked out with string and tape measure. Anyone who needs accuracy has to hire expensive external surveyors \u2013 an avoidable cost factor.<\/p>\n<h3>3. Lost knowledge through analog documentation<\/h3>\n<p>Local conditions are usually surveyed by hand and documented on paper plans. These plans then often disappear into drawers \u2013 which makes planning follow-up projects massively harder.<\/p>\n<h3>4. No link between photos and position<\/h3>\n<p>Site photos are rarely georeferenced. As a result, important proof of work performed is often missing at billing, for example for difficult ground conditions.<\/p>\n<h3>5. Field measurements: laborious, time-consuming, error-prone<\/h3>\n<p>Asphalt areas or other components are still frequently recorded with a measuring wheel \u2013 noted on clipboards. A method from the past that wastes valuable working time.<\/p>\n<p><strong>Conclusion:<\/strong> The consequences of analog processes are high costs, laborious rework and a lack of transparency. Those who digitize now secure a clear competitive advantage \u2013 with more efficient workflows, more precise data and better collaboration between site and office.<\/p>\n<h2>The solution: SitePlan<\/h2>\n<p>With SitePlan you digitize your surveying and geo-documentation \u2013 simple, fast and accurate.<\/p>\n<ul>\n<li><strong>Digital plans<\/strong> are georeferenced and used on the smartphone \u2013 just like Google Maps.<\/li>\n<li><strong>Photos<\/strong> are automatically linked to location data.<\/li>\n<li><strong>GNSS antenna<\/strong> enables centimeter-accurate measurements and stake-out.<\/li>\n<li><strong>Export functions<\/strong> for PDF, TXT or DXF reports make handovers to clients easier.<\/li>\n<\/ul>\n<p><strong>Particularly important:<\/strong> Even foremen and site managers without surveying training can work productively and safely with the app thanks to its simple operation.<\/p>\n<p>&nbsp;<\/p>\n<h2>Four use cases from the field<\/h2>\n<p>&nbsp;<\/p>\n<h3>1. Utility markings<\/h3>\n<p>With SitePlan and a GNSS antenna, utility lines are marked precisely from PDF plans in just a few minutes \u2013 without tape measure and string<\/p>\n<ul>\n<li><strong>94 % time savings compared to the classic method<\/strong><\/li>\n<li>70\u201380 % fewer utility strikes<\/li>\n<li>Particularly helpful with utility plans, e.g. from telecommunications providers<\/li>\n<\/ul>\n<p>\u201cOne look at the app shows me immediately where the existing utilities run. That saves an enormous amount of time.\u201d \u2013 Reinhold S., Foreman, PORR<\/p>\n<p>&nbsp;<\/p>\n<h3>2. Stake-out<\/h3>\n<p>Service connections, manholes, routes or clearing areas can be staked out independently with SitePlan \u2013 external surveyors are usually no longer needed.<\/p>\n<ul>\n<li><strong>Up to 80% savings on surveying costs<\/strong><strong><br \/>\n<\/strong><\/li>\n<li>Import of coordinate lists possible<\/li>\n<li>No more waiting and coordination times<\/li>\n<\/ul>\n<p><i>\u201cMy foreman can get started right away. Especially with 1,100m of drainage pipes, a real game changer.\u201d \u2013 Maximilian R., Site Manager, STRABAG<\/i><\/p>\n<p>&nbsp;<\/p>\n<h3>3. cm-accurate as-built survey<\/h3>\n<p>More and more clients demand precise documentation as a separate bill item. With SitePlan this requirement is handled in-house \u2013 at no extra cost.<\/p>\n<ul>\n<li><strong>Capture utility routes at the push of a button<\/strong><\/li>\n<li>Georeferenced photos including coordinates<\/li>\n<li>Data export for CAD and GIS programs with just a few clicks<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h3>4. Digital field measurements<\/h3>\n<p>Asphalt areas and other geometries can be captured in seconds with the GNSS antenna \u2013 directly on site, centimeter-accurate, automatically synchronized.<\/p>\n<ul>\n<li><strong>5x faster<\/strong> than with measuring wheel and clipboard<\/li>\n<li>Live sync in the office + PDF measurement report immediately available without post-processing<\/li>\n<li>Structure developed together with Deutsche Bahn \u2013 audit-proof &amp; verifiable<\/li>\n<\/ul>\n<p><i>\u201cI\u2019m always up to date in the office \u2013 and have the basis for billing right there.\u201d \u2013 Thomas P., Quantity Surveyor, STRABAG<\/i><\/p>\n<h2>Areas of application and projects<\/h2>\n<p>SitePlan is used flexibly and across sectors \u2013 from small construction companies to large infrastructure projects. Typical areas of application are:<\/p>\n<ul>\n<li><strong>Utility, earthworks, water and road construction<\/strong><br \/>\nIdeal for service connections, excavation work, asphalting and sewer construction.<\/li>\n<li><strong>Railway construction<\/strong><br \/>\nUsed at Deutsche Bahn and by renowned railway construction companies such as Rhomberg Sersa Rail Group or Rail Power Systems for documentation, measurement and stake-out.<\/li>\n<li><strong>Used by small to large construction companies<\/strong><br \/>\nFrom regional civil engineering contractors to national players such as STRABAG, PORR, DB and many more.<\/li>\n<\/ul>\n<h2>Examples from site<\/h2>\n<h3>Rehabilitation of ABA &amp; WVA Spittal an der Drau (Austria)<\/h3>\n<p><strong>STRABAG<\/strong> on behalf of the municipality of Spittal<\/p>\n<p><strong>Use:<\/strong> Digital measurements, utility locating and GPS photo documentation for documenting and billing several kilometers of utility construction.<\/p>\n<p>&nbsp;<\/p>\n<h3>Broadband rollout Deutsche Bahn (Germany)<\/h3>\n<p><strong>DB Bahnbau Gruppe<\/strong> on behalf of <strong>DB InfraGo<\/strong><\/p>\n<p><strong>Use:<\/strong> Route-wide GPS photo documentation and as-built survey along thousands of kilometers of railway line for route assessment and planning.<\/p>\n<p>&nbsp;<\/p>\n<h3>Flood protection Sch\u00e4rding (Austria)<\/h3>\n<p><strong>ARGE PORR\u2013SWIETELSKY<\/strong> on behalf of the city of Sch\u00e4rding<\/p>\n<p><strong>Use:<\/strong> Digital stake-out of sheet pile walls, embankments and utility lines as well as georeferenced as-built survey for end-to-end construction documentation.<\/p>\n<h2>Your advantages at a glance<\/h2>\n<p>\u2705  with georeferenced photo documentation, no information about billable work performed and variations is lost at billing anymore<\/p>\n<p>\u2705  existing utilities are marked 10x faster and 70-80% of utility strikes are avoided<\/p>\n<p>\u2705  approx. 80% of external surveying costs can be saved.<\/p>\n<p>\u2705  field measurements are created more than 5x faster with SitePlan.<\/p>\n<p>\u2705  the cm-accurate as-built survey brings a major competitive and price advantage<\/p>\n<p>\u2705  site and office connected: access to all data at any time from any device<\/p>\n<p>&nbsp;<\/p>\n<h3>Get personal advice<\/h3>\n<p>Want to know how SitePlan can be used specifically in your company \u2013 or start a pilot project right away?<br \/>\nThen book a no-obligation consultation with our team now:<\/p>\n\n\t\t<\/div>\n\t<\/div>\n<div class=\"vc_btn3-container  wpb_animate_when_almost_visible wpb_appear appear vc_btn3-center vc_do_btn\" ><a onmouseenter=\"this.style.backgroundColor='#f23630'; this.style.color='#f7f7f7'; this.style.borderColor='#f23630';\" onmouseleave=\"this.style.backgroundColor='#F4524D'; this.style.color='#fff'; this.style.borderColor='#F4524D';\" style=\"background-color:#F4524D; color:#fff; border-color:#F4524D;\" class=\"vc_general vc_btn3 vc_btn3-size-lg vc_btn3-shape-rounded vc_btn3-style-modern vc_btn3-icon-left\" href=\"https:\/\/www.siteplan.at\/en\/demo\/\" title=\"Schedule a demo now\"><i class=\"vc_btn3-icon fa fa-solid fa-calendar-check\"><\/i> Book a demo now<\/a><\/div>\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<p>Or test the SitePlan app for free:<\/p>\n\n\t\t<\/div>\n\t<\/div>\n<div class=\"vc_btn3-container vc_btn3-center vc_do_btn\" ><a style=\"background-color:#ebebeb; color:#666;\" class=\"vc_general vc_btn3 vc_btn3-size-md vc_btn3-shape-rounded vc_btn3-style-modern vc_btn3-icon-left\" href=\"https:\/\/www.siteplan.at\/en\/registration\/\" title=\"Registration\"><i class=\"vc_btn3-icon fa fa-solid fa-mobile-screen\"><\/i> Test the app for free<\/a><\/div>\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<p>We\u2019ll show you how easy getting started with digital site documentation really is \u2013 individually, practical and with no obligation.<\/p>\n\n\t\t<\/div>\n\t<\/div>\n<\/div><\/div><\/div><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Stellen Sie sich vor, Ihr Baustellenteam kann Aufma\u00dfe, Absteckungen und Dokumentationen selbstst\u00e4ndig, schnell und pr\u00e4zise durchf\u00fchren \u2013 ohne externe Vermesser oder teures Spezial-Equipment. Genau das erm\u00f6glicht<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":123460,"featured_media":4162,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[43,44,33],"class_list":["post-1908","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fachwissen","tag-digitalisierung","tag-messrad","tag-tiefbau"],"_links":{"self":[{"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/posts\/1908","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/users\/123460"}],"replies":[{"embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/comments?post=1908"}],"version-history":[{"count":14,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/posts\/1908\/revisions"}],"predecessor-version":[{"id":4169,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/posts\/1908\/revisions\/4169"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/media\/4162"}],"wp:attachment":[{"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/media?parent=1908"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/categories?post=1908"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/tags?post=1908"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}