{"id":3034,"date":"2025-09-11T08:02:27","date_gmt":"2025-09-11T06:02:27","guid":{"rendered":"https:\/\/www.siteplan.at\/?p=3034"},"modified":"2026-03-25T11:39:27","modified_gmt":"2026-03-25T10:39:27","slug":"casestudy-rail-power-systems","status":"publish","type":"post","link":"https:\/\/www.siteplan.at\/en\/casestudy-rail-power-systems\/","title":{"rendered":"Rail Power Systems: In 12 Monaten vom Pilot zur unternehmensweiten Ausrollung [Case Study]"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><div class=\"vc_row wpb_row vc_row-fluid\"><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<div style=\"width: 1090px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.siteplan.at\/wp-content\/uploads\/rail-power-systems__casestudy.png\" alt=\"Rail Power Systems Case Study: Nationwide GNSS rollout\" width=\"1080\" height=\"566\" \/><p class=\"wp-caption-text\">From mistake to success story: From pilot to company-wide roll-out in 12 months<\/p><\/div>\n<h2>About Rail Power Systems<\/h2>\n<p><b>Rail Power Systems (RPS)<\/b><span style=\"font-weight: 400;\"> is a leading provider in the field of railroad infrastructure and overhead line construction. As a long-standing partner of Deutsche Bahn, RPS plans and implements projects throughout Germany - with a focus on quality, precision and adherence to deadlines.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The impetus for digitization came from a specific surveying error in the field.<\/span><\/p>\n<p>&nbsp;<\/p>\n<h2>1. initial situation: A mast in the wrong place<\/h2>\n<p><span style=\"font-weight: 400;\">What happens if a survey point is set incorrectly?<\/span><\/p>\n<p><span style=\"font-weight: 400;\">At Rail Power Systems, one such error led to the incorrect foundation of an overhead line mast - unnoticed until the track was built. The incident initially went unnoticed - only six months later, during track construction, did it become clear that the mast was meters away from the target point.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The cause was quickly found, but the consequences were serious: delays, additional work and costs. One thing was clear - a solution was needed that would allow more self-monitoring on the construction site.<\/span><\/p>\n<p>&nbsp;<\/p>\n<h2>2. goals: More control, better documentation, faster processes<\/h2>\n<p><span style=\"font-weight: 400;\">The incident gave rise to a central question:<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><b>How can quality assurance on the construction site be supported digitally - without high additional costs?<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Rail Power Systems pursued several goals:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Error prevention through self-monitoring<\/b><span style=\"font-weight: 400;\"> surveying and foundation work<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Georeferenced photo documentation<\/b><span style=\"font-weight: 400;\"> Without manual storage<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>More efficient marking of mast locations<\/b><span style=\"font-weight: 400;\"> in the planning phase<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Digital support<\/b><span style=\"font-weight: 400;\"> for teamwork<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Simple, intuitive system<\/b><span style=\"font-weight: 400;\"> for non-technical users<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h2>3. the solution: SitePlan GNSS antenna + app<\/h2>\n<p><span style=\"font-weight: 400;\">The solution was not long in coming:<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><b>SitePlan was evaluated on the recommendation of a project manager<\/b><span style=\"font-weight: 400;\"> - a combination of <\/span><b>GNSS antenna, app and web platform<\/b><span style=\"font-weight: 400;\">specially developed for use in infrastructure construction.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">SitePlan enables a <\/span><b>Precise self-monitoring<\/b><span style=\"font-weight: 400;\"> and supports central use cases:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Geo-referenced photo documentation &amp; task management<\/b><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Stakeout &amp; localization in the field<\/b><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>As-built survey &amp; digital measurement<\/b><\/li>\n<\/ul>\n<blockquote><p>\n<span style=\"font-weight: 400;\">\"Instead of tape measures, notes and loose photos: Today, documentation is done directly via smartphone - <\/span><b>accurate to the centimeter in combination with the GNSS antenna and fully digital<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p>We didn't want a heavy measuring system - we wanted something that simply works. And it does.\"<\/p>\n<p><span style=\"font-weight: 400;\">- <\/span><i><span style=\"font-weight: 400;\">Richard Bulang, Technical Project Manager, RPS<\/span><\/i>\n<\/p><\/blockquote>\n<p><span style=\"font-weight: 400;\">With just a few clicks, you can record measuring points, automatically locate photos and create complete reports - ideal for inspections, acceptance tests or project handovers. <\/span><\/p>\n<p>Intuitive, mobile and practical - even without previous experience.<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" src=\"https:\/\/www.siteplan.at\/wp-content\/uploads\/casestudy_rail-power-systems-komplettpaket.jpg\" alt=\"Rail Power Systems Case Study: Nationwide GNSS application\" width=\"1000\" height=\"1000\" \/><\/p>\n<p>&nbsp;<\/p>\n<h2>4. implementation plan<\/h2>\n<p><b><i>From pilot to standard in 12 months<\/i><\/b><\/p>\n<p><span style=\"font-weight: 400;\">What began with a pilot project in the Dresden construction office developed into a company-wide standard solution at Rail Power Systems within a year.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In the <\/span><b>Pilot phase<\/b><span style=\"font-weight: 400;\"> SitePlan was launched on a small scale with a <\/span><b>Complete GNSS package<\/b><span style=\"font-weight: 400;\"> tested. The solution quickly proved convincing - both technically and in practical use.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As a result, the decision was made to equip all locations with the <\/span><b>\"Ready-to-use GNSS complete package<\/b><span style=\"font-weight: 400;\"> consisting of GNSS antenna, 3x SitePlan app (mobile &amp; web-based), cloud-based data storage and correction data service.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">To ensure the smoothest possible introduction, the rollout phase was actively supported. Richard Bulang took over the central coordination - with <\/span><b>Info mails, online training courses<\/b><span style=\"font-weight: 400;\"> and a <\/span><b>Key user principle<\/b><span style=\"font-weight: 400;\"> per location. In addition, an internal guideline was created, supported by training videos from SitePlan.<\/span><\/p>\n<blockquote><p>\n<b>\"Many colleagues were shy at first - but after three clicks in the app, they were hooked.\"<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400;\"> - <\/span><i><span style=\"font-weight: 400;\">Richard Bulang<\/span><\/i>\n<\/p><\/blockquote>\n<p>&nbsp;<\/p>\n<h3>Summary of the roll-out process:<\/h3>\n\n\t\t<\/div>\n\t<\/div>\n\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<div class=\"vc_hidden-md vc_hidden-sm vc_hidden-xs\">\n<table>\n<tbody>\n<tr>\n<td><b>Phase<\/b><\/td>\n<td><b>Key activities<\/b><\/td>\n<td><b>Learning<\/b><\/td>\n<\/tr>\n<tr>\n<td><b>Pilot<\/b><\/td>\n<td><span style=\"font-weight: 400;\">- Piloting in Dresden with complete GNSS package<\/span><\/p>\n<p><span style=\"font-weight: 400;\">- First experience gained in the field<\/span><\/td>\n<td><b>\"The system is convincing - but without implementation, potential often remains untapped.\"<\/b><\/p>\n<p><span style=\"font-weight: 400;\">\u2192 Schedule training at an early stage<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Investment<\/b><\/td>\n<td><span style=\"font-weight: 400;\">- GNSS complete package per location<\/span><\/p>\n<p><span style=\"font-weight: 400;\">- Equipment from <\/span><b>&gt;60 people with a SitePlan license<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Usage behavior initially varied - early experiences at individual locations were helpful for dissemination<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Training &amp; Rollout<\/b><\/td>\n<td><span style=\"font-weight: 400;\">- Info mails to users<\/span><\/p>\n<p><span style=\"font-weight: 400;\">- Online training for the software<\/span><\/p>\n<p><span style=\"font-weight: 400;\">- Key users per location<\/span><\/p>\n<p><span style=\"font-weight: 400;\">- Creation of an internal guide + use of explanatory videos<\/span><\/td>\n<td><b>\"Training reduces barriers and creates acceptance.\"<\/b><\/p>\n<p><span style=\"font-weight: 400;\">\u2192 Combination of central introduction &amp; local support works<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n\n\t\t<\/div>\n\t<\/div>\n\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<div class=\"vc_hidden-lg vc_hidden-md vc_hidden-sm\"><a href=\"https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-rolloutprocess.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-4029 size-full\" src=\"https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-rolloutprocess.png\" alt=\"\" width=\"1212\" height=\"937\" srcset=\"https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-rolloutprocess.png 1210w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-rolloutprocess-300x231.png 300w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-rolloutprocess-1024x789.png 1024w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-rolloutprocess-768x592.png 768w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-rolloutprocess-16x12.png 16w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-rolloutprocess-360x277.png 360w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-rolloutprocess-97x75.png 97w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-rolloutprocess-480x370.png 480w\" sizes=\"auto, (max-width:767px) 480px, (max-width:1212px) 100vw, 1212px\" \/><\/a><\/div>\n\n\t\t<\/div>\n\t<\/div>\n\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<h2>5. results: Tangible benefits in everyday construction site work<\/h2>\n<p><span style=\"font-weight: 400;\">With the introduction of SitePlan, Rail Power Systems has made significant progress in several areas. <\/span><b>Sustainable efficiency gains<\/b><span style=\"font-weight: 400;\"> achieved - especially in planning, documentation and quality assurance on the construction site.<\/span><\/p>\n<p>&nbsp;<\/p>\n<h3>Before and after at a glance<\/h3>\n\n\t\t<\/div>\n\t<\/div>\n\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<div class=\"vc_hidden-md vc_hidden-sm vc_hidden-xs\">\n<table>\n<tbody>\n<tr>\n<td><b>Scope of action<\/b><\/td>\n<td><b>Before<\/b><\/td>\n<td><b>With SitePlan<\/b><\/td>\n<\/tr>\n<tr>\n<td><b>Marking out mast locations<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Measuring tape over 20-30 m, inaccurate due to angle &amp; sag<\/span><\/td>\n<td><span style=\"font-weight: 400;\">GNSS-based, <\/span><b>5\u00d7 faster<\/b><span style=\"font-weight: 400;\"> and much more precise<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>GPS photo documentation<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Individual photos, manual labeling, filing in private folders<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Location-accurate photos directly in the site plan, no sorting effort<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Error avoidance<\/b><\/td>\n<td><span style=\"font-weight: 400;\">No possibility for self-monitoring<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Plausibility check on site - <\/span><b>Incorrect foundations since then at 0 %<\/b><\/td>\n<\/tr>\n<tr>\n<td><b>Acceptance in the team<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Skepticism among non-technical colleagues<\/span><\/td>\n<td><span style=\"font-weight: 400;\">After a short introduction <\/span><b>self-explanatory<\/b><span style=\"font-weight: 400;\">App is actively used throughout the team<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n\n\t\t<\/div>\n\t<\/div>\n\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<div class=\"vc_hidden-lg vc_hidden-md vc_hidden-sm\"><a href=\"https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-comparison.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-4028 size-full\" src=\"https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-comparison.png\" alt=\"Rail Power Systems Comparison\" width=\"1208\" height=\"673\" srcset=\"https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-comparison.png 1210w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-comparison-300x157.png 300w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-comparison-1024x537.png 1024w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-comparison-768x403.png 768w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-comparison-18x9.png 18w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-comparison-360x189.png 360w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-comparison-143x75.png 143w, https:\/\/www.siteplan.at\/wp-content\/uploads\/rps-comparison-480x252.png 480w\" sizes=\"auto, (max-width:767px) 480px, (max-width:1208px) 100vw, 1208px\" \/><\/a><\/div>\n\n\t\t<\/div>\n\t<\/div>\n\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<blockquote><p>\n\"Marking out at the start of a project is now five times faster - we used to do it with a tape measure. Now we go out with the antenna, record points and that's it.\"<b><br \/>\n<\/b><span style=\"font-weight: 400;\"> - <\/span><i><span style=\"font-weight: 400;\">Richard Bulang, Technical Project Manager, RPS<\/span><\/i>\n<\/p><\/blockquote>\n<p>&nbsp;<\/p>\n<h3>Time and quality gains at a glance<\/h3>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Planning 5\u00d7 faster:<\/b><span style=\"font-weight: 400;\"> Today, pylon sites are marked in a fifth of the time they used to be - directly on site, as early as the design phase.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Photo reports instead of minutes:<\/b><span style=\"font-weight: 400;\"> Documentation takes place directly in SitePlan - georeferenced, annotated and without post-processing.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Better data transfer:<\/b><span style=\"font-weight: 400;\"> Information from the quotation phase is available across all projects - without media discontinuity and with reference to the location.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Avoid mistakes instead of correcting them:<\/b><span style=\"font-weight: 400;\"> Since the introduction of SitePlan, there have been no more faulty mast foundations.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Quick introduction, wide use:<\/b><span style=\"font-weight: 400;\"> After three compact training sessions, all teams work independently with the system.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><\/li>\n<\/ul>\n<p><b><br \/>\n<\/b><span style=\"font-weight: 400;\"> SitePlan saves Rail Power Systems today <\/span><b>Hundreds of hours of manual work and follow-up<\/b><span style=\"font-weight: 400;\"> - especially in planning, documentation and self-monitoring. Processes are more efficient, data is more structured and the team is more digital.<\/span><\/p>\n<p>&nbsp;<\/p>\n<h2>6. best practices: Success factors during rollout<\/h2>\n<p><span style=\"font-weight: 400;\">The rollout of SitePlan at Rail Power Systems shows that technology alone is not enough - the decisive factor is the <strong>\"<\/strong><\/span><strong>How\"<\/strong><span style=\"font-weight: 400;\"> of the introduction. Five factors have proven to be particularly effective:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Start small, scale big:<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400;\">A pilot in the Dresden construction office laid the foundation - with clear objectives and a real practical test.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Actively accompany the introduction:<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400;\">Short training sessions, personal invitations and clear communication took away the fear early on - especially among less tech-savvy users.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Key user per location:<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400;\">Local contacts pass on knowledge, support software and antenna handling and ensure acceptance on site.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Company-specific guideline:<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400;\">An internal guide explains typical use cases - supplemented by explanatory videos from SitePlan.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Showing live works:<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400;\">The live demo at a project manager conference convinced many - often \"three clicks\" are enough to get started.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h2>7 Outlook: Integration and standardization<\/h2>\n<p><span style=\"font-weight: 400;\">Following the successful rollout, RPS now uses SitePlan in its day-to-day work on the construction site. <\/span><b>Reliable and established throughout the team<\/b><span style=\"font-weight: 400;\">. The next step: <\/span><b>Better integration into existing systems<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Interfaces to internal IT:<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400;\">Among other things, the automatic transfer of photos to the project drive via the SitePlan API is being tested.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Standardized data collection:<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400;\">Own attribute templates will be used in future to <\/span><b>structured and standardized across locations<\/b><span style=\"font-weight: 400;\"> document.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<blockquote><p>\n<i><span style=\"font-weight: 400;\">\"SitePlan has become part of everyday life - now we want to integrate it even more closely with our processes.\"<\/span><\/i><i><span style=\"font-weight: 400;\"><br \/>\n<\/span><\/i><span style=\"font-weight: 400;\"> - <\/span><i><span style=\"font-weight: 400;\">Richard Bulang<\/span><\/i>\n<\/p><\/blockquote>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" src=\"https:\/\/www.siteplan.at\/wp-content\/uploads\/aufmass-abrechnung-tiefbau4.png\" alt=\"Rail Power Systems x digital measurement with the SitePlan app\" width=\"1050\" height=\"550\" \/><\/p>\n<p>&nbsp;<\/p>\n<h2>Conclusion: From single pilot to established solution<\/h2>\n<p><span style=\"font-weight: 400;\">What began with an incorrectly positioned mast foundation became the catalyst for a new, digital way of working in railroad construction. <\/span><span style=\"font-weight: 400;\">Today, SitePlan Rail Power Systems provides support for planning, documentation and quality assurance. <\/span><b>Mobile, precise and efficient<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">More than <\/span><b>60 employees<\/b><span style=\"font-weight: 400;\"> have now been issued with licenses, <\/span><b>Each location has at least one complete GNSS package<\/b><span style=\"font-weight: 400;\">. This is how RPS saves <\/span><b>Hundreds of hours of surveying and manual reworking<\/b><span style=\"font-weight: 400;\"> - with higher data quality and better traceability at the same time.<\/span><\/p>\n<p>With a clear rollout concept, SitePlan has developed from a pilot project to a company-wide solution - and is now an integral part of everyday construction site life at RPS.<\/p>\n\n\t\t<\/div>\n\t<\/div>\n<\/div><\/div><\/div><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"Vom Fehler zur Erfolgsgeschichte: In 12 Monaten vom Pilot zur unternehmensweiten Ausrollung \u00dcber Rail Power Systems Rail Power Systems (RPS) ist ein f\u00fchrender Anbieter im Bereich<span class=\"excerpt-hellip\"> [\u2026]<\/span>","protected":false},"author":123460,"featured_media":4161,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[70,39,69],"class_list":["post-3034","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fachwissen","tag-bundesweite-ausrollung","tag-case-study","tag-rail-power-systems"],"_links":{"self":[{"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/posts\/3034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/users\/123460"}],"replies":[{"embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/comments?post=3034"}],"version-history":[{"count":10,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/posts\/3034\/revisions"}],"predecessor-version":[{"id":4030,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/posts\/3034\/revisions\/4030"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/media\/4161"}],"wp:attachment":[{"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/media?parent=3034"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/categories?post=3034"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/tags?post=3034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}