{"id":3167,"date":"2025-09-24T11:18:52","date_gmt":"2025-09-24T09:18:52","guid":{"rendered":"https:\/\/www.siteplan.at\/?p=3167"},"modified":"2026-03-03T13:58:37","modified_gmt":"2026-03-03T12:58:37","slug":"siteplan-app-explained","status":"publish","type":"post","link":"https:\/\/www.siteplan.at\/en\/siteplan-app-erklaert\/","title":{"rendered":"Digital construction site documentation made easy - with SitePlan"},"content":{"rendered":"<h2>A lot is done in civil engineering, but not always properly documented<\/h2>\n<p>A lot is done in civil engineering, but not always properly documented.<\/p>\n<p>And this is where many problems arise that often only become apparent later. For example:<\/p>\n<p><strong>1. the column is ready, but the stakeout is missing.<\/strong><\/p>\n<p>Stakes cannot be found, coordinates have not been provided.<br \/>\nThe result: standstill and countless queries to the surveyor.<\/p>\n<p><strong>2. the measurement has been made, but without the necessary context.<\/strong><\/p>\n<p>There are photos, but no coordinates, no plan reference, no time.<br \/>\nOne wonders: Where exactly was that? And when?<\/p>\n<p><strong>3. the billing is due, but the evidence is incomplete.<\/strong><\/p>\n<p>The joy is great, because the work on the construction site is finally done.<br \/>\nAnd then?<br \/>\nIf the client cannot check the measurements because important information is missing. The money remains unpaid.<\/p>\n<p>These situations do not arise due to negligence, but because there is a lack of smart tools that really simplify everyday life on the construction site instead of just complicating everything.<\/p>\n<p>The solution?<\/p>\n<p>If measurements, photos and items are recorded digitally directly on site, this saves everyone involved time and unnecessary discussions.<\/p>\n<p>Without any extra work. Without extra effort.<\/p>\n<p>This is exactly where we come in with SitePlan, our app for civil engineering.<\/p>\n<p>If you like, you can take a look here: <a href=\"https:\/\/www.siteplan.at\/en\/\">The SitePlan app<\/a>.<\/p>\n<p>&nbsp;<\/p>\n<h2>The civil engineering vicious circle<\/h2>\n<p>Some processes in civil engineering are repetitive. Not out of convenience, but because there is often simply not enough time to scrutinize them.<\/p>\n<p>- Measurements are improvised (thanks to measuring wheel accuracy)<br \/>\n- After work, we work diligently - all the scattered information is collected together<br \/>\n- The final calculation is like guesswork because there is no clear documentation<br \/>\n- And in the end, there's stress with the client because the measurement doesn't fit at the back and front - and in the end there's less billable service left<\/p>\n<p>This creates a pattern that repeats itself week after week. A typical vicious circle.<\/p>\n<p>We actually know that it could be done differently.<\/p>\n<p>But between coordination, construction progress and deadline pressure, there is often no time to break new ground.<\/p>\n<p>But what few people know?<\/p>\n<p>Civil engineering is also quick, easy and super precise - without having to constantly run after the information.<\/p>\n<p>Smart, digital tools can help to break the vicious circle:<\/p>\n<p>\u2794 The correct measurement can be viewed directly on the smartphone, tablet or PC.<br \/>\n\u2794 Photos are automatically saved with position and time stamp in a central location.<br \/>\n\u2794 The measurement report is created with 3 clicks - 100 % traceable, without days of rework.<\/p>\n<p>No substitute for experience. But a real support in everyday construction site life.<\/p>\n<p>And once you get involved, you soon realize:<\/p>\n<p>The effort involved is less than you might think.<\/p>\n<p>And the difference? Noticeable. Especially in terms of time and costs.<\/p>\n<p>&nbsp;<\/p>\n<h2>As soon as the excavators start, precise measurements are a thing of the past<\/h2>\n<p>6 a.m.<br \/>\nFog. Construction site.<br \/>\nAlone.<\/p>\n<p>You know that as soon as the excavators start, precise measurements are a thing of the past.<br \/>\nSo there you are, with a batten, measuring tape and a quiet question in your head:<\/p>\n<p>Why do I still do it this way?<\/p>\n<p>The game goes on:<br \/>\nForeman arrives, discussion, new questions.<br \/>\nThen into the car, 1 hour drive, head full.<br \/>\nIn the office CAD, inserts, layouts, printing, post-processing.<\/p>\n<p>All for a few missing measurements.<\/p>\n<p>When I talk to site managers, I often hear:<br \/>\n\"It's always been like that.\"<\/p>\n<p>The costs:<br \/>\n\ud83d\udd50 2 h drive &amp; measurement<br \/>\n\ud83d\udd50 2 h CAD &amp; supplements<br \/>\n\ud83d\udd50 1 h rework<br \/>\n= 5 hours<br \/>\n= 500 \u20ac Site manager costs<\/p>\n<p>But does it have to?<\/p>\n<p>It's easier with measurement apps:<br \/>\n\u2794 Measurement directly on the construction site - by the foreman<br \/>\n\u2794 All digital, live sync with office<br \/>\n\u2794 No duplication of work, no reworking<\/p>\n<p>Plus:<br \/>\nMore time after work, less pressure in everyday life.<\/p>\n<p>&nbsp;<\/p>\n<h2>From the diary of a young site manager: \"The new guy &amp; the complicated system.\"<\/h2>\n<p>At last! After months of waiting, a young, motivated construction technician is hired.<br \/>\nHe should help with measuring and relieve you as site manager.<\/p>\n<p>The GNSS device is ready. It works. Theoretically.<\/p>\n<p>In practice, only a few have dared to use it so far - too many buttons, too many menus, too complicated.<br \/>\nBut now the new one is supposed to work with it. So it's your turn: school enrollment.<br \/>\nYou explain to him how to load points. Which buttons to press. How to export the data.<\/p>\n<p>In the office, you show him how to convert the file - so that it can somehow be used in CAD.<br \/>\nHe stands next to you, nods friendly, but you can see: he's out. Overwhelmed. And you? You're starting to get impatient.<br \/>\nBecause you don't actually have time to explain everything three times.<\/p>\n<p>So you go out again. Do it yourself. Show it again.<br \/>\nBut instead of being relieved, you are now even more tied down.<br \/>\nYou ask yourself: How long will it take before it's really ready for use?<\/p>\n<p>And then you try something else:<\/p>\n<p>You give him the SitePlan app.<br \/>\nNo training. No jumble of data. No menus to explain.<br \/>\nThe young technician clicks through for ten minutes - and understands.<br \/>\nIt then immediately measures, plugs in and creates professional, verifiable reports.<\/p>\n<p>That is the advantage of SitePlan: radical simplicity.<\/p>\n<p>&nbsp;<\/p>\n<h2>From the diary of a young site manager: \"Vacation with the construction site in your luggage.\"<\/h2>\n<p>Vacation with a construction site - do you know that?<br \/>\nTwo weeks out. Clear your head, recharge your batteries.<br \/>\nBut as a site manager? Sounds easier than it is.<\/p>\n<p>Because the construction site is not on vacation.<\/p>\n<p>And before you even get to packing your suitcase, the final spurt begins:<\/p>\n<p>- Stake out points<br \/>\n- Collect plans<br \/>\n- Document measurements<br \/>\n- Prepare statements<br \/>\n- Organize handovers - if anyone takes over at all<\/p>\n<p>And that on several construction sites at the same time.<\/p>\n<p>Friday evening. Maybe even Saturday morning.<br \/>\nAt some point, everything is \"halfway\" sorted - and you set off.<\/p>\n<p>Two days later:<br \/>\nCell phone rings. The foreman.<\/p>\n<p>\u274c Stakeout point is gone<br \/>\n\u274c Questions about the plan status<br \/>\n\u274c Documentation for a measurement is missing<\/p>\n<p>They had said: \"Only call if you really have to.\"<br \/>\nThe time has come. And you are helping - from your cell phone. Because you know:<\/p>\n<p>If nothing happens now,<br \/>\n- the construction site may be at a standstill<br \/>\n- something important cannot be accounted for<\/p>\n<p>\ud83d\udccc Conclusion: vacation was just a change of location<\/p>\n<p>After the vacation?<\/p>\n<p>- Request photos<br \/>\n- Reconstruct designs<br \/>\n- Split up billing<\/p>\n<p>The result?<br \/>\nA lot of stress. And often no really auditable billing.<\/p>\n<p>With SitePlan, the construction site runs without you:<\/p>\n<p>\u2705 Before going on vacation: set points, prepare plans - everything saved digitally in the project<\/p>\n<p>\u2705 While on vacation: the foreman measures in himself, stakes out, documents independently<\/p>\n<p>\u2705 No phone calls. No stress. No interrupted vacation<\/p>\n<p>\u2705 After your vacation: you open the app, see all your photos, measurements and tasks - and continue seamlessly<\/p>\n<p>Vacation is vacation. And the construction site continues anyway.<\/p>\n<p>\ud83e\uddee Conservatively estimated, you save on every vacation:<\/p>\n<p>\u2794 4 hours of preparation &amp; additional stress before vacation<br \/>\n\u2794 1 hour queries during vacation<br \/>\n\u2794 2 hours rework &amp; search for measurements afterwards<\/p>\n<p>= 7 hours saved<br \/>\n= At 100 \u20ac\/h site manager costs = 700 \u20ac stress costs<\/p>\n<p>Vacation used to be just a change of location with WhatsApp stress. Today, the construction site just keeps going.<\/p>\n<p>&nbsp;<\/p>\n<h2>The trench is open, the pipe is in place - and suddenly everything happens very quickly<\/h2>\n<p>The trench is open, the pipe is in place - and suddenly everything happens very quickly:<\/p>\n<p>Backfill, compact, move on to the next section.<\/p>\n<p>Only:<\/p>\n<p>The documentation lags behind.<\/p>\n<p>Once again.<\/p>\n<p>No measurement taken.<br \/>\nNo photo taken.<br \/>\nNo record of when which pipe was installed - let alone with which heights or coordinates.<\/p>\n<p>In everyday construction site life in civil engineering?<\/p>\n<p>Quite normal for many.<\/p>\n<p>Especially when it's a tight schedule, the columns are moving through and the construction company is under pressure.<\/p>\n<p>That's just the way it is. \ud83e\udd37\u200d\u2642\ufe0f<\/p>\n<p>But it shouldn't be like that.<\/p>\n<p>This is because the basis is then missing at the latest at the time of invoicing, the addendum or the next building inspection:<\/p>\n<p>No evidence of services rendered, no traceable location of fixtures, no GPS data for quality assurance.<\/p>\n<p>What follows?<\/p>\n<p>Measure. Search. Reconstruct. Explain.<br \/>\nAnd:<br \/>\nInvoice reductions.<br \/>\nOr do you prefer to save yourself all the stress?<\/p>\n<p>This is exactly why we developed SitePlan.<\/p>\n<p>For complete, verifiable documentation in 3 clicks:<\/p>\n<p>- traceable for authorities<br \/>\n- Resilient for supplements<br \/>\n- Audit-proof for clients<\/p>\n<p>Who did this once?<\/p>\n<p>Doesn't want to go back.<\/p>\n<p>&nbsp;<\/p>\n<h2>Next acceptance in civil engineering<\/h2>\n<p>How is your next acceptance in civil engineering going?<\/p>\n<p>Stress-free, with clear evidence - or again with discussions about missing measurements, blurred photos and questionable sketches?<\/p>\n<p>The truth is:<br \/>\nA good acceptance procedure does not just begin on the acceptance date -<br \/>\nit starts with documentation from day one.<\/p>\n<p>When everything is neatly documented from the first shaft to the last paving stone:<\/p>\n<p>- Every point is comprehensible<br \/>\n- Each photo is georeferenced<br \/>\n- Every report is ready<\/p>\n<p>... then acceptance becomes a formality - and not an acid test.<\/p>\n<p>This creates:<\/p>\n<p>- Trust between client and employee<br \/>\n- Time savings for everyone involved<br \/>\n- Projects that are completed cleanly and on time<\/p>\n<p>This is exactly where SitePlan comes in:<\/p>\n<p>Measurement, stakeout &amp; GPS photo documentation directly via app<\/p>\n<p>Accurate to the centimeter with smartphone + GNSS antenna<\/p>\n<p>Evidence-proof reports with just a few clicks<\/p>\n<p>So that you don't have to explain during acceptance<br \/>\nbut simply be able to show what has been achieved.<\/p>\n<p>Read more: <a href=\"https:\/\/www.siteplan.at\/en\/\">The Google Maps for Civil Engineering<\/a><\/p>\n<p>&nbsp;<\/p>\n<h2>What can be seen on construction sites every day<\/h2>\n<p>\"The civil engineering vicious circle.\" What can be seen on construction sites every day:<\/p>\n<p>\ud83d\udd04 Stress on the construction site<br \/>\n\ud83d\udd04 Improvised photos &amp; measurements<br \/>\n\ud83d\udd04 Follow-up + guessing game<br \/>\n\ud83d\udd04 Missing proof of billing<br \/>\n\ud83d\udd04 Less money for construction work<\/p>\n<p>...and then all over again: money pressure leads to even more stress.<\/p>\n<p>The more often we see the vicious circle, the clearer it becomes:<\/p>\n<p>It does not stop by itself.<br \/>\nYou have to actively break through it.<\/p>\n<p>\ud83d\udcf2 The way out?<\/p>\n<p>Replacing analog with digital processes.<\/p>\n<p>Documentation from the cell phone directly to the construction site. Simple + accurate to the centimeter. Measurement report in 3 clicks<\/p>\n<p>You can, with SitePlan.<\/p>\n<p><a href=\"https:\/\/www.siteplan.at\/en\/civil-engineering-vicious-circle\/\">Find out more about the civil engineering subgroup.<\/a><\/p>\n<p>&nbsp;<\/p>\n<h2>From the diary of a young site manager: \u201eCall from the client from the penultimate construction site\u201c<\/h2>\n<p>\ud83d\udea8 The phone rings.<br \/>\nIt's the client's turn - and he wants to hear the reasons.<\/p>\n<p>You've long since moved on two construction sites, but you're being asked back from the one before last:<\/p>\n<p>The trench has already been backfilled, asphalt or paving removed, only the compacted substructure is still exposed.<br \/>\nNo more visible cables, no shaft rings, nothing to prove the effort that went into the installation.<\/p>\n<p>And then the question:<br \/>\n\u201eHow exactly was this made? What work went into it?\u201c<\/p>\n<p>In the past, that was the moment when the stress began:<\/p>\n<p>\u274c Nobody had taken any photos<br \/>\n\u274c Just a few notes on a crumpled piece of paper<br \/>\n\u274c Discussions unavoidable - and the final bill still shaky<\/p>\n<p>SitePlan works differently:<\/p>\n<p>\ud83d\udfe2 Polishers document immediately while working - photos &amp; measurements<br \/>\n\ud83d\udfe2 Everything automatically georeferenced, with timestamp &amp; viewing direction<br \/>\n\ud83d\udfe2 Site manager has proof with two clicks on the smartphone<\/p>\n<p>The result:<\/p>\n<p>\ud83d\udcd1 Client receives a PDF report in seconds<br \/>\n\u23f1 Several hours of time saved<br \/>\n\u2794 No stress, no discussions, no lost proofs<\/p>\n<p>...With analog measurements and paper chaos, every call from the client is a nail-biter.<\/p>\n<p>Digitization is an opportunity to show professionalism - because evidence is not missing, but is immediately available<\/p>\n<p>&nbsp;<\/p>\n<h2>From the diary of a young site manager: \u201eTraining new people on the construction site\u201c<\/h2>\n<p>\ud83d\udc77\u200d\u2642\ufe0f The previous foreman is absent indefinitely due to burnout.<br \/>\nA new one takes over - and for you as a site manager that often means<\/p>\n<p>Start from scratch again.<\/p>\n<p>This is still possible for small construction sites.<br \/>\nBut with larger projects, it quickly becomes a time waster:<\/p>\n<p>- You explain for the third time where the edge strip goes<br \/>\n- Show transfer points to the municipality<br \/>\n- Stake out shafts or foundations together<\/p>\n<p>And you still end up sitting over the plans for hours on end.<br \/>\nOr - to be on the safe side - order the surveyor after all.<\/p>\n<p>This means you lose valuable time that you actually need for billing, appointments or other projects.<\/p>\n<p>\ud83d\udcf2 It would have been different with SitePlan:<\/p>\n<p>- New foremen or supervisors simply open the project on their smartphone<br \/>\n- Plans are georeferenced and stored in the correct position<br \/>\n- The stakeout is carried out independently via GNSS - without queries<\/p>\n<p>I used to have to show every new foreman everything.<br \/>\nToday he simply looks at it himself in SitePlan.<\/p>\n<p>P.S.:<br \/>\nLong-term absences due to burnout, heart attacks or overwork are unfortunately no longer exceptions - they are sadly part of everyday life on many construction sites.<br \/>\nThis makes it all the more important that we design processes in such a way that they relieve people - not put additional strain on them.<\/p>\n<p>&nbsp;<\/p>\n<h2>From the diary of a young site manager: \u201eMaterial stored incorrectly, construction progress blocked\u201c<\/h2>\n<p>\ud83d\udce6 The problem often starts inconspicuously:<br \/>\nA delivery of materials arrives on time. Several trades are working in parallel - civil engineering, structural engineering, utilities. It's a hive of activity, trucks roll in, material is delivered: Pipes, shafts, edge strips, cables.<\/p>\n<p>The foreman has his hands full. He instructs the driver, who dumps the material wherever there is space. For the moment, it seems pragmatic. Delivery completed, everything in place - hook on.<\/p>\n<p>A few days later. The crew wants to step on the gas, bring forward construction sections, save time. But then they take a look at the route: pipe packages and manhole material are now piled up exactly where construction should continue.<\/p>\n<p>The opportunity has been missed. Construction progress is stalling - not because people don't want to, but because the material is in the way.<\/p>\n<p>Now there are only two options:<\/p>\n<p>\u2794 Keep to the planned procedure and forget the time saved.<br \/>\n\u2794 Or relocation: order a crane truck, remove the excavator, lift for an hour, wait two hours.<\/p>\n<p>A good idea becomes a problem. Speed becomes standstill. Cost savings become additional work. Just because the delivery was incorrectly placed at the beginning.<\/p>\n<p>\ud83d\udef0\ufe0f It would have been different with SitePlan:<br \/>\nIn the app, the foreman can see exactly where construction will take place in the digital plan before delivery. He gives the driver specific instructions - and the material ends up where it is not in the way.<\/p>\n<p>\ud83d\udcb6 Time saving (conservative estimate):<br \/>\n- 1 hour relocation with excavator or crane truck<br \/>\n- 2 hours waiting time and interruption in the construction process<br \/>\n\u2192 = 3 hours saved<br \/>\n\u2192 At 100 \u20ac\/h site manager costs + excavator costs: ~500-600 \u20ac per case<\/p>\n<p>This preserves the option of bringing forward construction phases. No expensive relocations, no lost time.<br \/>\nInstead of blockade: Construction progress.<\/p>\n<p>&nbsp;<\/p>\n<h2>\u201eThree columns, three chaos systems\u201c<\/h2>\n<p>Three crews on one construction site - each doing it differently.<\/p>\n<p>The first foreman:<br \/>\nMeasurements in pencil in a notebook, photos collected via WhatsApp on Friday evening.<br \/>\nYou scroll through 80 pictures without context and have to guess what belongs to what.<\/p>\n<p>The second foreman:<br \/>\nSends emails with attachments every day.<br \/>\nSometimes there are photos, sometimes screenshots of plans - but half of them are missing. You search for file names like \u201eIMG_7365.jpg\u201c and try to put the information together.<\/p>\n<p>The third foreman:<br \/>\nHardly documented.<br \/>\nPhotos are only available on request or at some point via USB stick. Of course, this is exactly when you should have already settled up.<\/p>\n<p>And you as site manager?<br \/>\nYou collect everything, sort it, standardize it. Meanwhile, all three columns call you: Measure here, measure there, one more quick question.<\/p>\n<p>So you jump from squad to squad, measuring, documenting, losing time - right at the most stressful moment.<\/p>\n<p>It would be different with the SitePlan app:<br \/>\n- All columns work in the same system<br \/>\n- Uniform dimensions &amp; photo documentation, immediately synchronized<br \/>\n- Polishers measure &amp; stake out themselves<br \/>\n- No data hunting via WhatsApp, email or stick<\/p>\n<p>Time saving (conservative):<br \/>\n- 4h Sort documentation<br \/>\n- 3h Stake-out routes<br \/>\n- 3h Rework Billing<br \/>\n= 10h saved \u2192 1000 \u20ac at 100 \u20ac\/h<\/p>\n<p>Interested?<\/p>\n<p>More information under this link: www.siteplan.at\/de\/<\/p>\n<p>&nbsp;<\/p>\n<h2>From the diary of a young site manager: \u201eThree columns, three chaos systems\u201c<\/h2>\n<p>\u27f6 \u201eIf three crews are working on the construction site at the same time, I have three completely different sets of documentation on the table.\u201c<\/p>\n<p>One foreman writes measurements on pieces of paper and sends photos via WhatsApp.<br \/>\nThe second sends photos by e-mail.<br \/>\nThe third hardly delivers any measurements and photos until sometime via USB stick.<\/p>\n<p>For the site managers, this means<br \/>\n\u27f6 Hours of searching, sorting and standardizing - right at the time when bookings close and billing has to be completed. At the same time, all three crews want support with marking out, measuring and answering questions. The site manager jumps back and forth and loses an enormous amount of time.<\/p>\n<p>The process looks different with SitePlan:<br \/>\n- All foremen document and measure in the same system<br \/>\n- Measurements and photos are synchronized immediately<br \/>\n- Staking out and measuring can be done independently<br \/>\n- Reports are immediately available for billing and verification<\/p>\n<p>If each column uses its own system, chaos ensues.<br \/>\n\u27f6 With SitePlan, this results in uniform, traceable documentation - and noticeable relief in everyday civil engineering work.<\/p>\n<p>&nbsp;<\/p>\n<h2>\u201eMaterial stored incorrectly, construction progress blocked\u201c<\/h2>\n<p>\u2794 \u201eEverything is prepared - only the incorrectly unloaded material is in the way.\u201c<\/p>\n<p>A major construction site is underway. Several trades are working at the same time, trucks are delivering pipes, shafts and cables. The driver asks where he should unload. The foreman points to an open area - the main thing is that there is space.<\/p>\n<p>A few days later, the column returns there. The plan was to bring forward the next construction phase. A clear time advantage for everyone.<\/p>\n<p>But this is exactly where pipe packages and manhole material are now lying.<br \/>\nThe route is blocked.<\/p>\n<p>The options:<br \/>\n\u2794 Relocate material - order crane truck, remove excavator, lose hours<br \/>\n\u2794 Or stick to the original plan - the time saved is gone<\/p>\n<p>With SitePlan, things would be different: foremen can see in the digital plan where construction will take place later and control the delivery in a targeted manner. Material is right from the start - no blockages, no expensive overruns.<\/p>\n<p>This is everyday civil engineering as it often happens. And how it can be when digital tools bring order to logistics.<\/p>\n<p>&nbsp;<\/p>\n<h2>From the diary of a young site manager: \u201eTraining new people on the construction site\u201c<\/h2>\n<p>\u2794 \u201eAs soon as a new foreman arrives, I have to start from scratch again.\u201c<\/p>\n<p>A new face on the construction site - a foreman changes, a supervisor takes over.<\/p>\n<p>And for you as site manager, this means: everything from the beginning.<\/p>\n<p>They walk the route together, explain where the edge strips are, which manholes are to be installed and where the municipal transfer points are located.<\/p>\n<p>They show the foundations, re-stake out individual points.<br \/>\nIn between, the phone rings, the client is waiting, the plans for the next construction meeting are already piling up in the construction container.<\/p>\n<p>You actually wanted to take care of coordination and construction process control - instead you lose hours on training.<\/p>\n<p>The SitePlan app does things differently:<br \/>\n- The new foreman opens the project directly digitally<br \/>\n- All plans are georeferenced and stored in the correct position<br \/>\n- Using the GNSS rod, it independently marks out shafts, foundations and transfer points<br \/>\n- He gets the overview himself - not only after long explanations<\/p>\n<p>This means that you regain the freedom that a site manager needs to really lead.<\/p>\n<p>With SitePlan, the next personnel change will not be a time waster - but a smooth transition in civil engineering.<\/p>","protected":false},"excerpt":{"rendered":"<p>Im Tiefbau wird viel geleistet, aber nicht immer sauber dokumentiert Im Tiefbau wird viel geleistet, aber nicht immer sauber dokumentiert. Und genau da entstehen viele Probleme,<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":123460,"featured_media":-1,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[71],"tags":[41,48,43,53,50],"class_list":["post-3167","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tiefbau-shortcuts","tag-bauleiter","tag-digitale-baustelle","tag-digitalisierung","tag-gps","tag-polier"],"_links":{"self":[{"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/posts\/3167","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/users\/123460"}],"replies":[{"embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/comments?post=3167"}],"version-history":[{"count":7,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/posts\/3167\/revisions"}],"predecessor-version":[{"id":3997,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/posts\/3167\/revisions\/3997"}],"wp:attachment":[{"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/media?parent=3167"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/categories?post=3167"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.siteplan.at\/en\/wp-json\/wp\/v2\/tags?post=3167"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}