Staking out track centerlines, documenting cable routes, and taking measurements—even within the constraints of track possession windows.
Document utility lines in the open trench before it is backfilled. GPS photo documentation and utility line documentation performed directly on-site.
Stakeout without waiting for the surveyor, measurement without a measuring wheel – from the sub-base to the surface course.