Testimonials
With SitePlan, our site documentation and tracking run like clockwork.
Our foremen can independently document utilities and handle simple staking – no extensive training needed. All photos and data are digitally secured and centrally accessible. As a site manager, I have everything at my fingertips – without being on site.
⭐️ ⭐️ ⭐️ ⭐️ ⭐️
Dominik Schmidtzkonz – Site Manager, Pfaffinger Bau
My foreman is thrilled he can stake out everything right away – no waiting!
On one job we had to lay 1,100 m of drainage. SitePlan was essential. The foreman handled all staking and documentation himself. I stay up to date from the office and have a clear billing record.
⭐️ ⭐️ ⭐️ ⭐️ ⭐️
Maximilian Rutar – Site Manager, STRABAG
In the past, measuring and staking on construction sites was often time-consuming and error-prone – we stretched strings and measured many things manually.
Now things work faster and more precisely – everything's digital instead of a tape measure. Workflows from the construction site to the office are seamless. SitePlan saves us noticeable time and has become indispensable.
⭐️ ⭐️ ⭐️ ⭐️ ⭐️
David Mayer – Foreman, Felbermayr Bau
A glance at the app replaces tedious plan reading – locations are instantly clear.
Existing utilities and structures are easy to locate. No more time-consuming tape measurements. Even older crew members work independently after just 10 minutes of training.
⭐️ ⭐️ ⭐️ ⭐️ ⭐️
Reinhold Schnelzer – Foreman, PORR Civil Works
Trusted by market leaders in civil engineering
With SitePlan, the comparison between reality and plan is effortless.
It used to take an entire working day to carry out measurement work - with SitePlan this is done in a quarter of a day, which is a time saving of 75%. The records are consistent, so we can keep track of everything from acquisition to invoicing. The system is also very easy to use. SitePlan is a great relief for everyone in civil engineering - whether executing, supervising, tendering or planning.
⭐️ ⭐️ ⭐️ ⭐️ ⭐️
Fabian Frauenberger – Site Manager, Held & Francke
In the past, two or three people were often needed for measuring work,
who were out and about with a measuring wheel and clipboard and had to make notes and sketches at the same time. With SitePlan, I can now do this on my own and much more accurately. Digital measurement creation has simplified the billing process and reduced sources of error. The application is ideal for all exterior design and civil engineering work - from photo documentation to setting out. This not only saves time, but also nerves.
⭐️ ⭐️ ⭐️ ⭐️ ⭐️
Markus Aigner – Site Manager, Hitthaller
In the past, measuring and staking on construction sites was often time-consuming and error-prone – we stretched strings and measured many things manually.
With SitePlan, this is now not only digital, but also much faster and more precise. The entire workflow, from the construction site to the office, runs smoothly and saves a huge amount of time. Photo documentation is also super easy and ensures we can document every work in a transparent manner. SitePlan saves us a lot of time on the construction site and has become indispensable – it makes work easier for everyone involved.
⭐️ ⭐️ ⭐️ ⭐️ ⭐️
David Mayer – Foreman, Felbermayr Bau
With SitePlan, our site documentation and tracking run like clockwork.
The app makes it possible for foremen to carry out digital line documentation and simple stakeout work without a great deal of training. In the past, photos and important data for invoicing were often lost - now everything is recorded digitally and can be accessed centrally. I particularly appreciate the fact that I have all the relevant data safely in the office without having to be on site all the time. SitePlan is ideal for site managers and foremen who need uncomplicated, reliable documentation.
⭐️ ⭐️ ⭐️ ⭐️ ⭐️
Dominik Schmidtzkonz – Site Manager, Pfaffinger Bau
A look at the SitePlan app, which shows my position on the plan, is done much faster
than a look at a paper plan, in which I first have to orientate myself. This means that I know in shortest time where something has to be built and where the underground utilities run so as not to damage them during the excavation work. In addition, the laborious and time-consuming measuring work using tapes and strings is finally no longer necessary. And what's so great: SitePlan is so easy to use that even my colleague, who was about to retire, was able to work independently with it after 10 minutes of training.
⭐️ ⭐️ ⭐️ ⭐️ ⭐️
Reinhold Schnelzer – Foreman, PORR Civil Works
We already had a GPS system, but it was complicated and not user-friendly.
SitePlan, on the other hand, is easy to use and ideal for our team. The app saves us a lot of time with documentation and is accurate and uncomplicated. I am particularly impressed by the fast and reliable cooperation with the SitePlan team. For construction companies of all sizes, SitePlan is a strong partner that speeds up processes and simplifies documentation.
⭐️ ⭐️ ⭐️ ⭐️ ⭐️
Christian Penker – Managing Director, Infra-Connect
Before SitePlan, making georeferenced plans available on-site was extremely complex – an error-prone and time-consuming process.
Often, the information was simply impractical to access, especially on paper plans. With SitePlan, this has fundamentally changed: I now always have all relevant information, plans, and even GPS photo documentation at my fingertips on my tablet or smartphone. This greatly increases the quality and efficiency of my work, especially on line construction sites, where up-to-date and accurate data is essential. SitePlan ensures that all project participants are on the same page, which minimizes misunderstandings and optimizes collaboration. I wholeheartedly recommend it to everyone involved in civil engineering – from planners to contractors to clients.
⭐️ ⭐️ ⭐️ ⭐️ ⭐️
Christoph Schwarz – Site Manager, Bernard Group (Pipelines & Plant Construction)
My foreman is thrilled he can stake out everything right away – no waiting!
At our parking lot construction site, we had to lay 1100 m of drainage pipes, among other things. SitePlan has become indispensable for setting out. New pipes are also measured independently by the foreman and documented with photos. This means that I am always up to date in the office and also have an accounting basis. Our asphalt construction manager is also very satisfied with the app and the measurement reports. He even carried out an asphalt survey in a densely built-up and wooded area using the GNSS antenna and SitePlan. That also worked really well and went very quickly as usual!
⭐️ ⭐️ ⭐️ ⭐️ ⭐️
Maximilian Rutar – Site Manager, STRABAG
We didn't want a complicated measurement system – but something that simply works and is usable by everyone.
With SitePlan, we now mark mast locations five times faster, photos are automatically georeferenced, and faulty foundations are a thing of the past. The implementation was straightforward: We conducted short online training sessions, defined key users for each location—and after a few clicks in the app, the team's reservations quickly disappeared.
⭐️ ⭐️ ⭐️ ⭐️ ⭐️
Richard Bulang – Technical Project Manager, Rail Power Systems GmbH
Used throughout Germany and Austria
2,000+ active users | 10,000+ projects | 4 million+ points & photos
> 2,000 active users
> 10,000 projects
> 4 million points/photos
Our projects

Water supply and
sewage disposal system
Company: STRABAG
Client: Municipality of Spittal
Location: Spittal/Drau, Austria Austria

Reconstruction and expansion of the existing water supply and sewage disposal system of the municipality of Spittal an der Drau with a total length of several kilometers.
Activities:
- Locating and marking lines
- Staking out new line routes
- GPS Photo Documentation
- GNSS documentation of utilities and as-built documentation
- Digital field measurements

Broadband expansion of Deutsche Bahn
Company: DB Bahnbau Group
Client: DB Network
Location: Germany

Track inspections for the expansion of the broadband network along the entire rail network of the German national railway company 'Deutsche Bahn' with a total length of several thousand kilometers.
Activities:
- GPS photo documentation of local conditions for planning the construction work
- Measuring and marking of new constructions
- GNSS documentation of local conditions

Flood protection for the city of Schaerding
Company: PORR-SWIETELSKY
Client: Stadt Schaerding
Location: Schaerding, Austria

Construction of flood protection walls and dams (length over 1 kilometer). Construction of an underground seal using sheet pile walls (area 8.700m²), drainage pipes, pumping stations and rainwater sewers.
Activities:
- Staking out the earth dam, excavation for foundations and sheet piling, clearing work, sewer routes
- Locating and marking lines
- GNSS documentation of utilities and as-built documentation
- Digital field measurements

Tram section for the city of Karlsruhe
Company: Rhomberg Sersa Rail Group
Client: KASIG, VBK
Location: Karlsruhe, Germany

Construction of a tram section in the city of Karlsruhe with 3.2 kilometers of track, 1 quadri-lateral junction, 1 triangular junction and 2 more junctions with switches, all double track (at the time the largest road construction site in Karlsruhe).
Activities:
- Staking out line routes, manholes, piping, signal systems, etc.
- GPS Photo Documentation
- GNSS as-built documentation
- Digital field measurements

Sewage construction for the city of Wels
Company: PORR
Client: eww
Location: Wels, Austria

Construction of sewer and water pipes for newly developed housing estates for the whole city of Wels. Construction of a sewer collector with reinforced concrete oval profiles DN800/1200 and reinforced concrete pipes DN600, excavation depths up to 7 m.
Activities:
- Locating and marking lines
- Staking out line routes, manholes and house connections
- GPS Photo Documentation
- GNSS documentation of utilities and as-built documentation
- Digital field measurements

Reconstruction of railway switches
Company: Railroad construction Wels
Client: DB Network
Location: Stuttgart, Germany

Reconstruction of 9 switches (switch shape 500-760) in a 2-week track posession period
including soil improvement by installing a subgrade protective layer.
including soil improvement by installing a subgrade protection layer (PSS).
Activities:
- Measurement of the sea level heights of the individual building layers for the creation of a target/actual comparison
- GNSS as-built documentation
- Digital field measurements
Case studies and
application scenarios.
Facts for users and managers.

Case study Leica
"Navigating sites with GNSS paperless plans" in cooperation with Leica Geosystems and PORR Group.

Case study STRABAG
TV report "App instead of paper plans" in cooperation with STRABAG, Leica and Welt der Wunder.

Case Study DB Bahnbau
Study “Digital Surveying” in cooperation with DB Bahnbau Gruppe, DB Netz and ZIB.

