GPS photo documentary in civil engineering: Photos with location & timestamp
24.09.2025Do away with the paper chaos: digital civil engineering with SitePlan
24.09.2025A lot is done in civil engineering, but not always properly documented
A lot is done in civil engineering, but not always properly documented.
And this is where many problems arise that often only become apparent later. For example:
1. the column is ready, but the stakeout is missing.
Stakes cannot be found, coordinates have not been provided.
The result: standstill and countless queries to the surveyor.
2. the measurement has been made, but without the necessary context.
There are photos, but no coordinates, no plan reference, no time.
One wonders: Where exactly was that? And when?
3. the billing is due, but the evidence is incomplete.
The joy is great, because the work on the construction site is finally done.
And then?
If the client cannot check the measurements because important information is missing. The money remains unpaid.
These situations do not arise due to negligence, but because there is a lack of smart tools that really simplify everyday life on the construction site instead of just complicating everything.
The solution?
If measurements, photos and items are recorded digitally directly on site, this saves everyone involved time and unnecessary discussions.
Without any extra work. Without extra effort.
This is exactly where we come in with SitePlan, our app for civil engineering.
If you like, you can take a look here: The SitePlan app.
The civil engineering vicious circle
Some processes in civil engineering are repetitive. Not out of convenience, but because there is often simply not enough time to scrutinize them.
- Measurements are improvised (thanks to measuring wheel accuracy)
- After work, we work diligently - all the scattered information is collected together
- The final calculation is like guesswork because there is no clear documentation
- And in the end, there's stress with the client because the measurement doesn't fit at the back and front - and in the end there's less billable service left
This creates a pattern that repeats itself week after week. A typical vicious circle.
We actually know that it could be done differently.
But between coordination, construction progress and deadline pressure, there is often no time to break new ground.
But what few people know?
Civil engineering is also quick, easy and super precise - without having to constantly run after the information.
Smart, digital tools can help to break the vicious circle:
➔ The correct measurement can be viewed directly on the smartphone, tablet or PC.
➔ Photos are automatically saved with position and time stamp in a central location.
➔ The measurement report is created with 3 clicks - 100 % traceable, without days of rework.
No substitute for experience. But a real support in everyday construction site life.
And once you get involved, you soon realize:
The effort involved is less than you might think.
And the difference? Noticeable. Especially in terms of time and costs.
As soon as the excavators start, precise measurements are a thing of the past
6 a.m.
Fog. Construction site.
Alone.
You know that as soon as the excavators start, precise measurements are a thing of the past.
So there you are, with a batten, measuring tape and a quiet question in your head:
Why do I still do it this way?
The game goes on:
Foreman arrives, discussion, new questions.
Then into the car, 1 hour drive, head full.
In the office CAD, inserts, layouts, printing, post-processing.
All for a few missing measurements.
When I talk to site managers, I often hear:
"It's always been like that."
The costs:
🕐 2 h drive & measurement
🕐 2 h CAD & supplements
🕐 1 h rework
= 5 hours
= 500 € Site manager costs
But does it have to?
It's easier with measurement apps:
➔ Measurement directly on the construction site - by the foreman
➔ All digital, live sync with office
➔ No duplication of work, no reworking
Plus:
More time after work, less pressure in everyday life.
From the diary of a young site manager: "The new guy & the complicated system."
At last! After months of waiting, a young, motivated construction technician is hired.
He should help with measuring and relieve you as site manager.
The GNSS device is ready. It works. Theoretically.
In practice, only a few have dared to use it so far - too many buttons, too many menus, too complicated.
But now the new one is supposed to work with it. So it's your turn: school enrollment.
You explain to him how to load points. Which buttons to press. How to export the data.
In the office, you show him how to convert the file - so that it can somehow be used in CAD.
He stands next to you, nods friendly, but you can see: he's out. Overwhelmed. And you? You're starting to get impatient.
Because you don't actually have time to explain everything three times.
So you go out again. Do it yourself. Show it again.
But instead of being relieved, you are now even more tied down.
You ask yourself: How long will it take before it's really ready for use?
And then you try something else:
You give him the SitePlan app.
No training. No jumble of data. No menus to explain.
The young technician clicks through for ten minutes - and understands.
It then immediately measures, plugs in and creates professional, verifiable reports.
That is the advantage of SitePlan: radical simplicity.
From the diary of a young site manager: "Vacation with the construction site in your luggage."
Vacation with a construction site - do you know that?
Two weeks out. Clear your head, recharge your batteries.
But as a site manager? Sounds easier than it is.
Because the construction site is not on vacation.
And before you even get to packing your suitcase, the final spurt begins:
- Stake out points
- Collect plans
- Document measurements
- Prepare statements
- Organize handovers - if anyone takes over at all
And that on several construction sites at the same time.
Friday evening. Maybe even Saturday morning.
At some point, everything is "halfway" sorted - and you set off.
Two days later:
Cell phone rings. The foreman.
❌ Stakeout point is gone
❌ Questions about the plan status
❌ Documentation for a measurement is missing
They had said: "Only call if you really have to."
The time has come. And you are helping - from your cell phone. Because you know:
If nothing happens now,
- the construction site may be at a standstill
- something important cannot be accounted for
📌 Conclusion: vacation was just a change of location
After the vacation?
- Request photos
- Reconstruct designs
- Split up billing
The result?
A lot of stress. And often no really auditable billing.
With SitePlan, the construction site runs without you:
✅ Before going on vacation: set points, prepare plans - everything saved digitally in the project
✅ While on vacation: the foreman measures in himself, stakes out, documents independently
✅ No phone calls. No stress. No interrupted vacation
✅ After your vacation: you open the app, see all your photos, measurements and tasks - and continue seamlessly
Vacation is vacation. And the construction site continues anyway.
🧮 Conservatively estimated, you save on every vacation:
➔ 4 hours of preparation & additional stress before vacation
➔ 1 hour queries during vacation
➔ 2 hours rework & search for measurements afterwards
= 7 hours saved
= At 100 €/h site manager costs = 700 € stress costs
Vacation used to be just a change of location with WhatsApp stress. Today, the construction site just keeps going.
The trench is open, the pipe is in place - and suddenly everything happens very quickly
The trench is open, the pipe is in place - and suddenly everything happens very quickly:
Backfill, compact, move on to the next section.
Only:
The documentation lags behind.
Once again.
No measurement taken.
No photo taken.
No record of when which pipe was installed - let alone with which heights or coordinates.
In everyday construction site life in civil engineering?
Quite normal for many.
Especially when it's a tight schedule, the columns are moving through and the construction company is under pressure.
That's just the way it is. 🤷♂️
But it shouldn't be like that.
This is because the basis is then missing at the latest at the time of invoicing, the addendum or the next building inspection:
No evidence of services rendered, no traceable location of fixtures, no GPS data for quality assurance.
What follows?
Measure. Search. Reconstruct. Explain.
And:
Invoice reductions.
Or do you prefer to save yourself all the stress?
This is exactly why we developed SitePlan.
For complete, verifiable documentation in 3 clicks:
- traceable for authorities
- Resilient for supplements
- Audit-proof for clients
Who did this once?
Doesn't want to go back.
Next acceptance in civil engineering
How is your next acceptance in civil engineering going?
Stress-free, with clear evidence - or again with discussions about missing measurements, blurred photos and questionable sketches?
The truth is:
A good acceptance procedure does not just begin on the acceptance date -
it starts with documentation from day one.
When everything is neatly documented from the first shaft to the last paving stone:
- Every point is comprehensible
- Each photo is georeferenced
- Every report is ready
... then acceptance becomes a formality - and not an acid test.
This creates:
- Trust between client and employee
- Time savings for everyone involved
- Projects that are completed cleanly and on time
This is exactly where SitePlan comes in:
Measurement, stakeout & GPS photo documentation directly via app
Accurate to the centimeter with smartphone + GNSS antenna
Evidence-proof reports with just a few clicks
So that you don't have to explain during acceptance
but simply be able to show what has been achieved.
Read more: The Google Maps for Civil Engineering
What can be seen on construction sites every day
"The civil engineering vicious circle." What can be seen on construction sites every day:
🔄 Stress on the construction site
🔄 Improvised photos & measurements
🔄 Follow-up + guessing game
🔄 Missing proof of billing
🔄 Less money for construction work
...and then all over again: money pressure leads to even more stress.
The more often we see the vicious circle, the clearer it becomes:
It does not stop by itself.
You have to actively break through it.
📲 The way out?
Replacing analog with digital processes.
Documentation from the cell phone directly to the construction site. Simple + accurate to the centimeter. Measurement report in 3 clicks
You can, with SitePlan.