The challenge in civil engineering
Paper plans, tape measure and measuring wheel are still everyday tools on construction sites – and at the same time major cost drivers.
Typical problems:
- Laborious locating and stake-out on site
- High external surveying costs and dependence on surveyors
- Missing or incomplete construction documentation
- Delays and rework due to analog processes
SitePlan solves these challenges with an app that combines GPS-based navigation, cm-accurate surveying and digital construction documentation – directly on the smartphone.
How that plays out in practice is shown by three projects from Austria and Germany in which leading construction companies use SitePlan successfully.
Project 1: Rehabilitation & extension of wastewater and water supply

Location: Spittal an der Drau, Austria
Company: STRABAG
Client: Stadtgemeinde Spittal
Initial situation:
Several kilometers of utility network had to be rehabilitated and extended. Previously this required surveyors, paper plans and time-consuming stake-out work.
SitePlan functions used:
- Locating & marking utility lines
- Staking out new line routes
- GPS Photo Documentation
- Digital as-built survey of installed objects
- Field measurements
Result:
Faster stake-outs without external surveyors, complete digital documentation and direct synchronization with the office.
Project 2: Deutsche Bahn broadband rollout

Location: Germany
Company: DB Bahnbau Gruppe
Client: DB Netz
Initial situation:
Several thousand kilometers along the rail network had to be walked and documented for the broadband rollout.
SitePlan functions used:
- GPS photo documentation of the existing situation
- Capture of local conditions
- Surveying & marking of new structures
Result:
Seamless digital capture over large distances, simplified collaboration between field staff and planning team, less rework.
Project 3: Flood protection Schärding

Location: Schaerding, Austria
Company: Arge PORR–SWIETELSKY
Client: Stadt Schaerding
Initial situation:
Construction of 1,100 m of flood protection walls and embankments, incl. sheet pile walls, drainage pipes and sewer routes.
SitePlan functions used:
- Stake-out of earth embankments, foundations & sheet pile walls
- Clearing works & sewer routes
- Locating & marking utility lines
- As-built survey
- Digital field measurements
Result:
Reduction of external surveying costs by up to 80 %, faster construction progress through direct stake-out on site, complete as-built documentation for clients.
Why SitePlan?

The examples from STRABAG, DB Bahnbau and Arge PORR–SWIETELSKY show: with SitePlan, even complex infrastructure projects can be delivered much more efficiently.
Instead of paper plans, measuring wheel and external surveyors, a digital solution is used that foremen and site managers can use directly – without training effort, at any time and on their own devices.
The joint results from all projects:
- 80 % fewer external surveying costs
- 94 % time savings on utility marking
- 5x faster field measurements
- 70–80 % fewer utility strikes
- Immediate availability of all data for office and site
The bottom line: less waiting, lower costs, higher precision – and documentation that is always at hand.